Manufacturing NewsTEG DailyNovember 2, 2026

November 2, 2026 · Johnson County · Story 5 of 5

Amazon's $100M Greenwood Plant Brings Amazon Greenwood Manufacturing Jobs at Nearly $100,000

Amazon is investing more than $100 million in a 585,000-square-foot advanced manufacturing plant at 1175 Collins Road in Greenwood, purchasing and equipping an existing building rather than building new. The project will create 300 skilled manufacturing and engineering positions by the end of 2028, and Amazon Greenwood manufacturing jobs will pay an average of nearly $100,000 a year for roles including CNC operators, welders, powder coating technicians and controls engineers.

At roughly $333,000 in capital spent per job, this looks far more like a semiconductor or EV drivetrain build than a distribution center, and it follows two Massachusetts robotics plants and an August Texas announcement in Amazon's push to build its own robots in-house. The wage number is the part to watch locally. It lands on a 2027-2028 hiring timeline directly against Tier 1 and Tier 2 auto suppliers in Marion, Hendricks and Hamilton counties currently paying $23 to $26 an hour, a gap close to double that is likely to force wage increases or attrition at those plants within 12 to 18 months.

Impact
At roughly $333,000 in capex per job, the project's capital intensity resembles a semiconductor or EV drivetrain facility far more than a typical distribution center, and it's Amazon's next step after two Massachusetts robotics plants and an August 2026 Texas announcement in building out in-house robot manufacturing that bypasses third-party vendors like Symbotic. The $100,000 wage benchmark lands on a 2027-2028 hiring timeline that will directly compete with Tier 1 and Tier 2 auto suppliers in Marion, Hendricks and Hamilton counties currently paying $23-$26 an hour, a nearly 2x gap likely to force wage increases or attrition at those plants within 12 to 18 months.
Watch
Public disclosure of the IEDC incentive package tied to the project, and whether Amazon's product scope expands beyond drive units toward higher-complexity output given its 2026 Fauna Robotics humanoid acquisition.
For the huddle

With a $100,000 wage floor arriving in Johnson County on a 2027-2028 timeline, how exposed is our skilled-trades retention plan to a pay gap nearly double what we're currently offering CNC, welding and controls staff?

The wage gap is close to double current Tier 1 and Tier 2 supplier pay in the region, so a retention plan or counter-offer needs to be in place well before Amazon's 2028 launch, not after the first resignation.

Sources

  1. Amazon to invest $100 million in advanced manufacturing facility in Indiana · therobotreport.com

Earlier coverage

From the brief, November 2, 2026

  1. AtkinsRéalis, Indiana and Hoosier Energy Sign MOU to Study 6 GW CANDU Nuclear Campus
  2. Lockheed Martin Completes $3.4B Ultra Maritime Acquisition, Adds Columbia City Sonobuoy Plant
  3. Indiana Tech Workforce Hits 124,098 as AI Demand Spills Into Manufacturing
  4. Studebaker Museum's 'Motor City, Indiana' Exhibit Sits Two Miles From a Stalled Samsung SDI Battery Plant
  5. Amazon's $100M Greenwood Plant Brings Amazon Greenwood Manufacturing Jobs at Nearly $100,000

The whole day’s brief →

This story

Related

Manufacturers Energy Grant Program

Free for Johnson County manufacturers

Johnson County manufacturers receive free, ongoing energy auditing and cost control that reduces their energy bills and keeps them low, month after month. Every line item checked and validated, every opportunity found comes with a step-by-step guide to capture it.

EDCs: sponsor this program and it carries your organization's name For economic developers →