Manufacturing NewsTEG DailyOctober 5, 2026

October 5, 2026 · Bartholomew County · Dearborn County · Monroe County · Story 3 of 4

Duke Energy's Taylorsville Site Sits Beside One Company's Campus

Duke Energy Indiana named three 2026 Site Readiness Program sites on September 29: Taylorsville in Bartholomew County, St. Leon in Dearborn County, and 87 acres in Bloomington's Monroe County. None has a tenant yet. The Taylorsville site sits beside Grillo's Pickles and a future King's Hawaiian plant, both owned by Irresistible Foods Group, which makes that corridor effectively one company's campus. Reported wages near $30 an hour at the future King's Hawaiian plant will set a new bar for production workers in the area before it even opens. If you staff food or production lines in Bartholomew County, benchmark your turnover in overlapping roles now.

Impact
Duke's 13-year-old program (53 sites prepped, 32 wins, $15 billion recruited) is no longer the only utility running this playbook: Indiana Michigan Power launched its own 'Future Ready Sites Accelerator' this year with a different site-selection vendor, vetting five competing sites in DeKalb County, Muncie, and South Bend, while NIPSCO has instead routed large-load customers through a separate GenCo structure rather than compete on site marketing. That means Indiana's industrial land supply is now actively being fought over by rival utilities, not just rival communities.
Impact
What's not stated plainly: Grillo's Pickles and King's Hawaiian are both subsidiaries of the same parent, Irresistible Foods Group, meaning this 'cluster' is functionally a single company's campus, and IFG has publicly signaled optionality to add more of its own brands (Shaka Tea, Innovation Bakers) on adjacent land, which could make Duke's 'open market' marketing moot if IFG claims the newly readied parcels itself. Separately, King's Hawaiian's reported wage near $30/hour sets a de facto floor that any other incoming tenant, or any other Bartholomew County employer competing for the same rural workforce, will have to match or beat.
Watch
Whether any of the three 2026 sites converts to a named tenant (historically about 60% of Duke-prepared sites eventually do) and how I&M's competing five-site cohort performs in the same recruiting cycle.
Watch
Whether Irresistible Foods Group itself (rather than an outside tenant) moves to claim the Force Holdings/Palladin parcels for an additional brand before the site reaches open market.
For the huddle

What does the Duke Energy Taylorsville site mean for my labor pool?

If you staff food or production roles in Bartholomew County, benchmark your turnover now in the roles that overlap with food production. Reported wages near $30 an hour at the future King's Hawaiian plant will pull workers before the plant even opens.

From the brief, October 5, 2026

  1. Amazon's Greenwood Plant Doubles In-House Robot Production
  2. AES Indiana Rate Increase Rehearing Set for March 2027
  3. Duke Energy's Taylorsville Site Sits Beside One Company's Campus
  4. Doral's Mammoth Solar Phase 2 Permits Clear in Northern Indiana

The whole day’s brief →

This story

Related

Manufacturers Energy Grant Program

Free for Indiana manufacturers

Manufacturers from qualifying Indiana counties receive free, ongoing energy auditing and cost control that reduces their energy bills and keeps them low, month after month. Every line item checked and validated, every opportunity found comes with a step-by-step guide to capture it.

EDCs: sponsor this program and it carries your organization's name For economic developers →