Energy Answers, The Commercial & Industrial Energy Show
Operator Field Guide
Energy Decision 21
Decoding

Micronuclear and SMRs: What to Diligence

Vendors are pitching on-site nuclear to data centers, manufacturers, and remote sites. Here is how to tell a real project from a pitch deck before you sign anything.

Hosted by
Daniel Burke
A companion to
Episode 21 · Micronuclear & SMR Explained: What You Need to Know
Start here

Who this is for

  • ■Facility executives at large data centers evaluating on-site baseload power
  • ■Operations leaders at heavy manufacturing plants with process heat needs
  • ■Energy decision-makers at remote industrial sites tired of diesel
  • ■Critical infrastructure operators with constrained grid access
  • ■Anyone being pitched an SMR or microreactor proposal right now
The real question

Should my facility invest in micronuclear or SMR technology for on-site power, and what are the real risks?

01 First principles Two categories, two different problems

SMRs and microreactors are two distinct product categories aimed at different operational problems. SMRs are generally 300 MW or less per unit, aimed at utilities and large industrial users. Microreactors are 20 MW or less, aimed at remote sites, off-grid loads, and facilities that need something compact and transportable. For context, conventional large nuclear runs from 550 MW to 1,500 MW per unit.

Sizing thresholds by unit class
05001,0001,500Capacity per unit20Microreactor300SMR550Large (min)1,500Large (max)
The size class you evaluate determines the vendor list, the licensing pathway, and the use case.

35%of this guide, read. The rest of it is below.

  1. 2
  2. 3
  3. 4
  4. 5

Read the rest, download, print, and take it with you.

Get the PDF, free

Reading and watching are always free. Add your details and every guide unlocks for download instantly. No card, no charge.

Free, always. No spam. Your details just let Daniel and the TEG team follow up if you want a hand.